Wednesday, July 27, 2011
Summer, Summer wherefore art thou Summer
So far summer in the Pacific northwest has yet to arrive. We were lucky to get sunshine last weekend and we decided to spend it on board Blackheart. We arrived about 10:00 a.m. and set sail for Plumper Cove on Keats Island. With 8 knots apparent, we sailed closed hauled at 4.5 knots. We arrived at Plumper to find all moorings taken so we motored over to Gibson's Landing for fuel and water. First attempt at docking Blackheart went well although the current pushed the bow away before we were secure and then had to jockey a bit to bring the bow around. After fueling we tied up to to municiple docks and went in for an ice cream. 4 hours at the dock is now $12! I know! We had lots of positive comments on Blackheart which really makes all the hard work more rewarding.
We sailed out the "Gap" and around Popham Island before the wind died and motored back to our mooring. We spent Saturday night on board Blackheart and Sunday had very little wind so we motored over to some log booms and practiced our docking. We took some speed readings for future reference and was quite suprised to find we make 3.5 knots at idle and 6.5 at full throttle.
Vacation begins next week so I hope summer will finally arrive and we can get two weeks of sailing in.
Thursday, June 23, 2011
Splash
We launched Blackheart on Saturday, June 11, 2011. We were hoping to make it in time for the Round Bowen Island race, but it wasn't to be.
As we motored up to the cabin at Williamson's Landing, we passed the race leaders on their spinnaker runs along the north shore of Bowen Island.
We're tied up at a mooring bouy in front of the cabin for the summer.
New Furler
We got some great deals at the boat show.
First we purchased a furler from Pro-Tech Yacht Services. After considering my options, I elected to purchase the Harken Mark IV unit 1. Installation was dead simple and took about 4 hours. Only issues were that the toggle that is required between chainplate and forestay utilizes 1/2" clevis pins. My old rig uses a 9/16" pin. So I drill the holes in the toggle and had to make a 9/16" pin. I also had to trim the original shackle slightly so the furler would fit over.
I supported the mast with a couple of halyards and removed the tension from the backstay, pulled the clevis and shortend the turnbuckle by 1.75" to accomodate the toggle.
I fed each section of foil over the forestay and dropped the bottom end through my forehatch which allowed me to insert the joints, glue and screws at a comfortable height above the deck.
Friday, May 27, 2011
Winch Farm
I've heard these old IOR boats refered to as "winch farms" and I can understand it since there are 10 winches. It appears they have not been services in a very long time. This is my first time servicing winches so I had no idea what to expect. It ended up taking about an hour and a half to service the larger ones and about an hour for the smaller ones. Pretty simple once you've done one.
Sunday, May 1, 2011
Teak Deck Repair
Well I've been unable to get much done over the past few weeks due to a bad back, but I'm finally starting to feel a bit better so I'm making some progress again.
The foredeck has a bad spot where the lifeline stantion was pushed through and had been patched with an ugly layer of epoxy that didn't do much except look bad. I used a heat gun to soften up the epoxy and then prised it up with a thin pry bar. I've scraped away all the soft wood and will allow it to dry out for a couple of weeks.
I must say I was a bit disappointed to find that the teak decking was originally only 1/4" thick and had been sanded down who knows how many times, leaving little more than 1/16" remaining. The teak was laid down on top of 1/4" of mahogany exposed to the interior, and then 1/4" plywood with a layer of fiberglas between the plywood and teak. Unfortunatly I think I will have to continue with the Cetol coating rather than leaving the deck natural since the wood is so thin.
This is the damage done when a lifeline stantion was hit hard and poked a hole through the deck. A bad repair alowed water penetration and the plywood under the teak began to rot.

The foredeck has a bad spot where the lifeline stantion was pushed through and had been patched with an ugly layer of epoxy that didn't do much except look bad. I used a heat gun to soften up the epoxy and then prised it up with a thin pry bar. I've scraped away all the soft wood and will allow it to dry out for a couple of weeks.
I must say I was a bit disappointed to find that the teak decking was originally only 1/4" thick and had been sanded down who knows how many times, leaving little more than 1/16" remaining. The teak was laid down on top of 1/4" of mahogany exposed to the interior, and then 1/4" plywood with a layer of fiberglas between the plywood and teak. Unfortunatly I think I will have to continue with the Cetol coating rather than leaving the deck natural since the wood is so thin.
This is the damage done when a lifeline stantion was hit hard and poked a hole through the deck. A bad repair alowed water penetration and the plywood under the teak began to rot.

The water eventually made it's way down to the oak beam and caused about 6" to rot. Forunately there is still enough solid wood left resting on the gusset support. An hour or so with hammer an chisel to cut out the rot and shape the beam for a patch
The teak appears to have originally been 1/4" thick but after who knows how many sandings and refinishings over the past 33 years, it is now only 1/16th". I've cut back the teak with staggard joints
A new peice of oak married to the original with epoxy and screws.
The deck is composed of 3 - 1/4" layers. Here the interior layer is in place and thickend epoxy has been spread on prior to installing the middle layer of plywood
Finally, new teak strips are screwed down to the new plywood. The screws act as spacers and pieces of "all-around" act as washers to prevent the screw heads from slipping between the boards. Next step is to fill the gaps between the boards and let it cure and then sand it all down to the level of the rest of the deck.
I can't believe that May is almost done and I'm still working on the deck.
The patch on the foredeck turned out not bad but we'll have to see how it looks once the CETOL is on.
I found 4 or 5 other bad spots that also needed patching, but none as bad as the foredeck.
Thursday, April 14, 2011
V-berth construction
The next item on the To Do list is to re-vamp the V-berth.
This boat was built more for racing than cruising so the primary function of the forepeak was sail storage and staging.
Since we'll be doing more cruising than racing, we're looking for a little more comfort.
Unfortunately I forgot my camera the day I started the demolition so I don't have the before pictures, but here's a few pics of the work in progress.
Here you can see that I have cut down the port side of the V-berth to lower it by 13", and I have removed the sb side completely. The reason for this is that the sides were not symetrical. The board lying next to the hammer will be the new top of the V-berth. It will be just shy of 7' long and over 5' wide at the aft end. With 5" of foam, it should make a comfy bed.
The best method I have found to cut things out is to use an angle grinder with a very thin cut off wheel to cut through the fiberglas where the vertical meets the horizontal. Once the joint is cut all around, a good smack with a hammer usually will break the pieces apart. I can then slide a thin pry bar under the tape and prise it off. In this case it seems as though the fiberglas of the hull might not have been prepped properly before taping all the plywood sections in, as the tape just popped right off.
The sb side was shorter due to the hanging locker which has been removed exept the bottom. You can see the vertical bare patch where the hanging locker ended. I'll cut the bottom back to the pencil line which lines up with the bank of drawers on the port side. The coat rod is hung on the bulkhead and on one of the gussets supporting a deck beam, so I'll leave it open for the time being. I can close it in if we find it necessary to contain the clothes.
If feels good to get some work done finally. I've completed the rough fitting of the new v-berth.
So it's time for the ugly bit ... sanding down the entire forepeak to prep for epoxy taping the plywood to the hull and then painting. YUCK with an F. Oh well, hope to have all the taping done this weekend.
This boat was built more for racing than cruising so the primary function of the forepeak was sail storage and staging.
Since we'll be doing more cruising than racing, we're looking for a little more comfort.
Unfortunately I forgot my camera the day I started the demolition so I don't have the before pictures, but here's a few pics of the work in progress.
Here you can see that I have cut down the port side of the V-berth to lower it by 13", and I have removed the sb side completely. The reason for this is that the sides were not symetrical. The board lying next to the hammer will be the new top of the V-berth. It will be just shy of 7' long and over 5' wide at the aft end. With 5" of foam, it should make a comfy bed.
The best method I have found to cut things out is to use an angle grinder with a very thin cut off wheel to cut through the fiberglas where the vertical meets the horizontal. Once the joint is cut all around, a good smack with a hammer usually will break the pieces apart. I can then slide a thin pry bar under the tape and prise it off. In this case it seems as though the fiberglas of the hull might not have been prepped properly before taping all the plywood sections in, as the tape just popped right off.
The sb side was shorter due to the hanging locker which has been removed exept the bottom. You can see the vertical bare patch where the hanging locker ended. I'll cut the bottom back to the pencil line which lines up with the bank of drawers on the port side. The coat rod is hung on the bulkhead and on one of the gussets supporting a deck beam, so I'll leave it open for the time being. I can close it in if we find it necessary to contain the clothes.
If feels good to get some work done finally. I've completed the rough fitting of the new v-berth.
So it's time for the ugly bit ... sanding down the entire forepeak to prep for epoxy taping the plywood to the hull and then painting. YUCK with an F. Oh well, hope to have all the taping done this weekend.
Friday, February 25, 2011
Mast block collar
Since the cabin deck rot was caused by water leaking by the bolts holding pad eyes for the mast blocks, I've decided to eliminate them from the equation by fabricating a mast collar with eyes for attaching the blocks. I traced the mast collar flange with hole locations onto some cardboard and then shaped a faceplate to accept the eyes.
Once I was satisfied with the template I cut out the two pieces from 1/4" s.s. plate. It was a bit tough to bend the face plate, but with some serious heat, some clamps and a 5 lb hammer I was able to beat it into submission.
I'll weld the eyes directly into pairs of holes drilled in the face plate once my blocks arrive to ensure I have the spacing right.
My new Garhauer mast blocks finally arrived and I think my mast collar should work pretty wellOnce the weather warms up, I'll paint the cabin roof and then finish mounting the collar. I'm tempted to remove the ear with the eye off of the mast so I'll have more room for the collar boot.





















